INTERRA ACHIEVES 100% PROPPANT PLACEMENT ACROSS A 49 WELL PROJECT

CUSTOMER OBJECTIVE
LOCATION: WEST CENTRAL
SASKATCHEWAN

RAPTOR OC COIL SLEEVES

Technology Highlights
- Unlimited Stages.
- Unrestricted Full ID Wellbore.
- High rate screen out recovery, reducing downtime.
- Reduces re-opening run times, fluid usage and coil cycling.
- Long reach open and close capability.
- Does not require a toe port to activate the first stage.
- Fully mechanical shifting, allowing the use of slim shifting BHAs in the event of casing deformation issues.
Solution
Interra deployed its Raptor OC® (Open-Close) Coil Sleeves across the entire 49-well project.The Raptor OC is a mechanically shifted sleeve that functions open and closed with the Velocity™ Shifting Tool. The sleeve opens by shifting up, which prevents premature opening during cementing, and ensures that operators will always have enough force available to open the sleeves. The unique design of the Velocity Shifting Tool places the shifting tool below the isolation packer, protecting it during frac operations.
Once the frac is complete, operators can re-open all the sleeves via one continuous upward movement with no coil cycling required by auto-locating and self-releasing from the sleeves on the way out of the well. The Raptor OC system gives operators the choice to either annular frac, frac down coil or run packer-less with only the shifting tool.
Results
Another major benefit was Interra’s slim outside diameter (OD) option on the Velocity Shifting Tool, which allowed the operator to mitigate challenges such as debris, over torqued collars and casing deformation. By utilizing Interra’s engineering, manufacturing, service and delivery the operator was able to increase efficiencies, saving costs and reducing downtime.