RAPTOR VELOCITY

Annular Frac Packer & Velocity Shifting Tool

Features

  • Shifting tool is run below the frac packer to protect it from proppant.
  • Auto-locate feature eliminates the time required to locate sleeves.
  • Customizable flow rates for shifting tool activation.
  • Shifting tool can be run without the frac packer for packer-less applications.
  • Minimized time between stages.
  • Open all valves with one continuous upward movement, no cycling required.
  • Does not require a toe port to activate the first stage.
  • Optional component assists with closing sleeves in long reach applications.
  • Slimhole, post-frac shifting BHA options.
  • Positive shift indication on surface.
  • Ability to quickly mitigate screen outs.
  • Packer positioned below the sleeve protecting it from the frac and minimizing casing collapse instances. 

Overview

Interra Energy’s Raptor OC™ (Open-Close) Multistage System is composed of mechanically shiftable sleeves operated with the Velocity™ Shifting Tool and the Raptor Annular Frac Packer. The shifting tool is uniquely positioned below the annular frac packer protecting it from proppant during stimulation.

Operation

The Raptor Annular Frac Packer and Velocity Shifting Tool are run to the bottom of the well on coiled tubing or jointed pipe. When the bottom hole assembly (BHA) is in tension, flow is initiated down the tubing activating the shifting tool.

The BHA is then pulled up through the Raptor OC Sleeve, auto-locating, shifting open and self-releasing from the profile in one continuous movement. The BHA is then positioned below the sleeve, setting the annular frac packer to isolate all lower intervals. Once the frac is complete, the packer is released and positioned above the sleeve.

The operator then has the option to activate the Velocity Shifting Tool, run down through the Raptor OC sleeve and shift the interval closed. The process is repeated for the remainder of the well until all intervals have been stimulated.

After the stimulation is complete, the Velocity Shifting Tool can be run to the bottom of the well, activated and pulled to surface, opening all the Raptor OC Sleeves in one continuous motion.

Application

  • Annular Raptor OC Fracturing
  • Post-Frac Sleeve Manipulation

Related Products

Raptor

OC System

AccuJet

Toe Initiation
Sleeve

Raptor MRSS


Coiled Tubing Frac
Packer & MRSS
Shifting Tool

XacToe

Multistage
System

StrataJet

Multistage
System

Slimhole

Toe
Initiation Sub

Black Phantom

Multistage
System